Works have recently finished at the brand new ‘Stack’ at Seaburn; the second bar and restaurant container venue we have worked on with our associates Brims Construction in recent years.
Containing (no pun intended!) some 220m2 of wall tiling, our teams worked in two separate stints either side of lockdown to complete the project, operating in several toilet blocks across the site.
Despite the obvious challenges posed by Covid-19 we are ecstatic with our end results and would like to thank our tilers for both their positive attitude and excellent workmanship exemplified on the project.
We look forward to enjoying a drink or a bite to eat when the venue opens to the public later this week.