A job where we spent over two years on site; works at the five-star Buxton Crescent hotel and Thermal Spa appear to be nearing their final conclusion.  Working alongside our colleagues at Vinci Construction; our substantial tiling package included works to three leisure pools, numerous spa and changing facilities and 68 bathrooms. Additionally, works included a carefully constructed entrance lobby which featured new marble tiles fixed alongside the Crescents restored original marble flooring

Given the immense size and scope of the final program our time spent at Buxton was of course challenging. However, we are extremely pleased with the quality of our end result, and proud to have played a significant role in the restoration of such an important piece of British history.

See the following link for more information regarding the buildings vast and varied past.

 

Buxton Crescent