F ollowing its successful opening, we are proud to present some images which showcase our successful works completed at the state-of-the-art leisure development in Ponteland.

A project which ran for much of the latter half of 2020, our works at Ponteland involved over 1500m2 of wall tiling and 900m2 of floor tiling in a variety of finishes to a number of locations, most notably to the pool hall surround, changing facilities and bespoke spa area.

Alongside this, our works also comprised of a wide degree of additional ancillary works such as the installation of stainless-steel channels and gullies throughout; over 500m2 of screeding and associated waterproofing works, including the widespread usage of specialty epoxy-based products.

We wish to thank our colleagues at Kier Construction for the productive and enjoyable nature of the project and look forward to working alongside them on their future endeavors.