The access bridge within Sheffield University’s Advanced Manufacturing Research Centre (Factory 2050) for Interserve, required a Schluter Ditra 25 uncoupling membrane prior to tiling with Solus Ceramics’ 1500×750 porcelain floor tiles.
A further 300M² of the tiles had to be radially cut to fit around the annulus shaped office core of the factory.